You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Power plant Belchatow, Poland

Données des projets

Localisation: Belchatow, Pologne

Combustion gas desulphurisation sorption plant of the lignite-fired power plant Belchatow. Largest lignite-fired power plant in Europe with an electrical capacity of 4,700 MW.

Construction period: 2008-2011

Exigences

  • two-storey supporting structure with massive reinforced concrete parts while adhering to tiny dimensional tolerances for the acceptance of 55 m high steel silos
  • transfer of high loads in great heights

Client

Alstom S.A. (general contractor);
Budimex-Dromex S.A., Krakow (structural work)

Avantages pour le client

  • execution in short construction time
  • avoidance of additional temporary support
Eugeniusz Koper
Project leader

Poland’s largest foundation for turbo generators is part of the new Belchatow power plant block. In cooperation with Budimex-Dromex, PERI worked out a technically sophisticated shoring solution. The PERI systems, in connection with the excellent logistical service, enabled us to carry out the construction work in a short time.

Solution PERI

  • shoring solution for 25-80 cm thick slabs and 2.20-3.20 m high beams as well as massive reinforced concrete rings
  • logistics service
  • combination of the shoring systems MULTIPROP, ST 100 and HD 200
  • MP towers set into each other
  • load distribution via girder grids to the beams of the intermediate ceiling