Chachenka Motorway Bridge, Russian Federation

Données des projets

Design: Motorway Bridge
Lenght: 550m

Exigences

  • Bridge structure consisting of two separate parallel superstructures with double-cell hollow box cross-sections each 22.25 m wide and 4.00 m high
  • The individual span widths of the six bridge segments range from 57 m to 110 m

Client

Contractor
«SGC Autostrada»

Field Service
PERI Russia, Noginsk/Moscow, PERI Poland Sp. z o.o., Warsaw 

Avantages pour le client

  • Safe working platforms and access means through an ideal combination of VARIOKIT Balanced Cantilever Equipment and PERI UP modular scaffolding
  • Easy operational handling of the balanced cantilever equipment due to the integrated, centrally controlled mechanical system with hydraulic cylinders as well as lifting and moving devices for moving, lowering, lifting and pre-stressing of the carriage and formwork
  • Assembly on the construction site was carried out in the shortest possible time
  • Shuttering and striking as well as moving from cycle to cycle with only 6 men
  • Planned 10-day cycle maintained
  • Extremely cost-effective through the use of rentable VARIOKIT system components
Konnyh Aleksandr Andreevich | Zamaletdinov Fatih Nailovich, Head of Production and Engineering | Site Manager
Konnyh Aleksandr Andreevich | Zamaletdinov Fatih Nailovich
Head of Production and Engineering | Site Manager

With the VARIOKIT cantilevered construction carriage from PERI, we could safely realize the superstructure sections as well as in the planned working rhythm. On-site assembly also took place in a very short time.

Solution PERI

  • Comprehensive PERI project solution consisting of a balanced cantilever carriage and formwork from one source
  • Flexible adaptation of the VARIOKIT cantilever construction solution to match the individual construction site requirements
  • Simultaneous use of altogether 10 VARIOKIT cantilevered construction carriages
  • Construction of the 22.25 m wide superstructure sections with sectional lengths of 3.40 m to 4.10 m in regular 10-day cycles