You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

LNG liquid gas reservoirs Cameron, United States of America

Données des projets

Localisation: Cameron, États-Unis

3 circular containers for liquid gas storage with 77.50 m inner diameter and 43.80 m wall height each

Construction period: until 2007

Exigences

  • simultaneous manufacturing of 3 reservoirs
  • diminution of the wall cross section from 90 cm to 75 cm
  • consideration of reinforced shear walls

Client

Baker Concrete Constr., Houston

Avantages pour le client

  • saving of expensive tie points (only two tie layers at 4.65 m concreting height)
  • moving of VARIO and CB as climbing unit in one crane lift
  • climbing in 2-week cycle
  • smooth and safe striking and moving
  • punctual completion
LNG Statement - Vernon Abney, Foreman
Vernon Abney
Foreman

Striking and moving worked easily and safely. It only took us 13 days for one concreting section with the PERI climbing formwork solutions, and thus we are able to adhere to our schedule.

Solution PERI

  • delivery of 468 completely pre-assembled, rounded-out VARIO panels, 3.20 m wide and 4.90 m high
  • 80 climbing units for each reservoir, supported by CB 240 climbing platforms
  • friction-locked connection with VARIO articulated coupling